Optimization of limited water level in flood season and impounding scheme for reservoir in Three Gorges Project 三峡水库动态汛限水位与蓄水时机选定的优化设计
Deformation and stability analysis of the slide mass in front of the dam of Lijiaxia Hydropower Plant before and after reservoir impounding 李家峡水电站坝前滑坡蓄水前后的变形及稳定性分析